Completion Date:

2022

No. of Units:

N/A

Architect:

N/A

Service provided:

  • Design Options report for earthworks drainage
  • Track drainage design
  • Option A report

Construction Cost:

Client:

Whitfield Construction Services

Contractor:

Equate Design Limited

Project Manager/Lead Engineer:

Asad Tahir
ATCN Consulting limited was appointed by Whitfield Construction Services to provide design option report for earthwork drainage and track drainage design between Penshurst Station and Leigh Station “RTT” line. ATCN Consulting Limited provided the client the best possible solutions and provided detailed earthwork drainage and track drainage design within the client budget and time constrains. ATCN Consulting also produced option A report for the client.