Completion Date:
2022
No. of Units:
4
Architect:
Fallow Silverton
Service provided:
- CCTV Drainage Markup
- Detailed External Work
- Level Design Plan
Construction Cost:
£2 Million
Client:
Vector Structures
Contractor:
OE Consultancy LTD
Project Manager/Lead Engineer:
Ali Abbas Ahmed
ATCN was approached to provide a detailed drawings for the client building consisting of a ground floor, first floor and loft floor. ATCN as always meets the expectation of their client by delivering the projects/deliverables as per the mutually agreed time frames and keeping the project under the client budget. ATCN delivered a detailed CCTV Drainage Mark-up Plan and a detailed external work design Plan, surface and foul water drainage design, as well as a detailed Level Design and detailed external work construction detail.