Completion Date:

2022

No. of Units:

4

Architect:

Fallow Silverton

Service provided:

  • CCTV Drainage Markup
  • Detailed External Work
  • Level Design Plan

Construction Cost:

£2 Million

Client:

Vector Structures

Contractor:

OE Consultancy LTD

Project Manager/Lead Engineer:

Ali Abbas Ahmed

ATCN was approached to provide a detailed drawings for the client building consisting of a ground floor, first floor and loft floor. ATCN as always meets the expectation of their client by delivering the projects/deliverables as per the mutually agreed time frames and keeping the project under the client budget. ATCN delivered a detailed CCTV Drainage Mark-up Plan and a detailed external work design Plan, surface and foul water drainage design, as well as a detailed Level Design and detailed external work construction detail.