Completion Date:

On Going

No. of Units:

3 Houses

Architect:

St Andrews

Service provided:

  • Site Civil Engineering
  • Foul and Surface Water Drainage Design
  • Discharge of Pre-commencement Conditions and S278

Construction Cost:

£1.5M

Client:

Churchgate Premier Homes

Contractor:

Churchgate

Project Manager/Lead Engineer:

Khurram Malik
ATCN were commissioned by Churchgate Premier Homes to undertake the detailed drainage design for the development of 3 detached dwellings in the town of Bracknell. The planning included 2 pre commencement related to drainage and boundary treatment. The drainage system plans included dimensions, locations, gradients, invert and cover levels, headwall details, proposals for the proposed mitigation measures for managing surface water flood risk within the site.