Completion Date:
On Going
No. of Units:
3 Houses
Architect:
St Andrews
Service provided:
- Site Civil Engineering
- Foul and Surface Water Drainage Design
- Discharge of Pre-commencement Conditions and S278
Construction Cost:
£1.5M
Client:
Churchgate Premier Homes
Contractor:
Churchgate
Project Manager/Lead Engineer:
Khurram Malik
ATCN were commissioned by Churchgate Premier Homes to undertake the detailed drainage design for the development of 3 detached dwellings in the town of Bracknell. The planning included 2 pre commencement related to drainage and boundary treatment. The drainage system plans included dimensions, locations, gradients, invert and cover levels, headwall details, proposals for the proposed mitigation measures for managing surface water flood risk within the site.