Warning: The magic method Vc_Manager::__wakeup() must have public visibility in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/plugins/js_composer/js_composer.php on line 221 Deprecated: Required parameter $width follows optional parameter $attach_id in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/plugins/js_composer/include/helpers/helpers.php on line 401 Deprecated: Required parameter $height follows optional parameter $attach_id in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/plugins/js_composer/include/helpers/helpers.php on line 401 Deprecated: Required parameter $id follows optional parameter $input in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite/core/helper/unite-sanitize.php on line 662 Deprecated: Required parameter $args follows optional parameter $depth in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite-custom/ut-theme-menu-buttons.php on line 411 Deprecated: Required parameter $output follows optional parameter $depth in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite-custom/ut-theme-menu-buttons.php on line 411 Deprecated: Required parameter $args follows optional parameter $depth in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite-custom/ut-theme-menu.php on line 698 Deprecated: Required parameter $output follows optional parameter $depth in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite-custom/ut-theme-menu.php on line 698 Deprecated: Required parameter $args follows optional parameter $post_id in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/unite-custom/ut-theme-functions.php on line 689 Deprecated: Required parameter $svg follows optional parameter $area in /customers/6/a/c/atcnconsulting.com/httpd.www/wp-content/themes/brooklyn/vc/vc-params.php on line 2095 Horncastle | ATCN Consulting

Horncastle

Civil Engineering Services

The scope of works was to develop a surface water drainage strategy that was inclusive of SUDs, which would be adoptable by both the LLFA and WA. The scheme comprised of 256 low rise residential dwellings, four attenuation basins, swales and permeable paving. Further to gaining Outline Planning Approval the scheme was progressed to detailed design involving a S38 highways agreements with Lincolnshire County Council and S104 drainage agreement with Anglian Water.

The engineering solutions developed on this project had pushed the boundaries of what was normal for the relevant authorities to take under their adoption. However, the proposals were successful, so much so that Lincolnshire County Council included aspects of the SUDs constructions details from the scheme into their design guide.